12 April 2017

A few pictures from my walkabout on the evening of 12 April 2017. Good to see the main road wall repaired in two places and the progress with the Attenuation Pond. Also, the area around the bush shelter in Barrington Road has been tidied.

The emphasis on the street names is because we plan to do something similar to the Breeze and discus the relevance of the name at some point.