Public Open Space

What’s going on in UR today?

Posted on

Very pleased to be able to report that the Tennis Courts have started. The guys were removing the waste vegetation and preparing the surface by scrapping a layer of tarmac off. Lutyens Court has scaffolding erected as windows are being systematically replaced. Godfrey Place is still being prepared for tarmac on the 29th (scheduled for […]

Infrastructure

Road Closures within the village

Posted on

We have been informed about planned roadworks on a number of roads in Upper Rissington in the coming months: Sopwith Road, Farman Crescent, Hawker Square, Bleriot Road, Snipe Road, and Grebe Square.  A plan of the scheme is shown below. These roads will be closed at some point between 1st April 2019 and the 30th […]